Alerts

Traffic Advisory - Ellis St. and Balfour St.

Traffic_Advisory_-_August_28_2024_low.png
The Town of New Glasgow wishes to advise residents and motorists that a water valve replacement and associated road work will take place at the intersection of Ellis St. and Balfour St. on Wednesday, August 28th, 2024, weather permitting, with possible delay until Thursday, August 29, 2024, if required.
The work will be carried out between 8.30 a.m. to 4 p.m. and will include a street closure on Ellis St. (Riverview St.-Balfour St.). Motorists are advised to use alternate routes whenever possible.
This work will impact water customers on Ellis St., Balfour St. and Athletic St. causing a period of no water from 10 a.m. to 2 p.m. Customers may experience low water pressure and dirty water for a short period following the work and should flush their system thoroughly to remove any residual dirt.
Traffic control will be in place including detours. Please drive safely through this worksite and be aware of pedestrians, workers, and work vehicles.
The Town of New Glasgow regrets any inconvenience this may cause and thanks the public for their cooperation.